How to assemble and install a galvanized sheet metal tower

Feb 07, 2026

Leave a message

The installation of a galvanized feeding tower is a systematic project requiring meticulous planning, professional tools, and skilled operation.

 

The entire installation process can be divided into five major steps: pre-installation preparation, foundation construction, tower assembly, auxiliary system installation, and final commissioning and acceptance. Below, I will break down the key points and precautions for each step in detail.

 

Pre-installation Preparation

1. Site Survey and Planning: Before installation, a detailed site survey must be conducted. Ensure the site is flat, firm, and has sufficient space to accommodate the feeding tower itself and transport/hoisting vehicles. According to the product parameters of the galvanized feeding tower produced by Dezhou Muxin Livestock Equipment Co., Ltd., its height can reach 5400mm, its diameter 4.55 meters, and its capacity 22 cubic meters. This means that a working space far exceeding its own dimensions needs to be reserved. At the same time, the relative position of the feeding tower to the pigsty and feed truck access should be planned to ensure convenient feed replenishment by the feeding truck later.

Equipment and Tools Inventory: Galvanized feed towers are usually shipped in loose parts, as clearly stated by products supplied by Botou Shichang Livestock Machinery Co., Ltd. Therefore, before installation, all components must be carefully checked against the list, including tower walls, top cover, brackets, screws, sealant, etc., to ensure nothing is missing. Essential tools include: a crane (select according to the feed tower's tonnage, e.g., a 10-ton feed tower requires a crane of the corresponding tonnage), an aerial work platform or scaffolding, an electric wrench, a level, a torque wrench (to achieve the specified torque when tightening screws, such as 120-150 Nm), safety ropes, etc.

 

Foundation Construction and Support Installation

1. Concrete Foundation Pouring:
This is crucial for ensuring the long-term stable use of the feed tower. The dimensions and depth of the foundation must be strictly calculated based on the full load weight of the feed tower (including feed) and local geological conditions. For example, for a 15-ton feed tower, the foundation depth is typically no less than 800mm, and anchor bolts for fixing the support legs must be pre-embedded. The recommended concrete grade is no less than C25. After pouring, it must be fully cured for at least 7 days to reach the design strength before the upper installation can proceed.

2. Support Leg and Support Installation:
Securely install the support legs or supports of the feed tower onto the concrete foundation using anchor bolts. During this process, a level must be repeatedly used to ensure that the tops of all support legs are on the same horizontal plane, with an error controlled within 3mm. For pig farm feed towers manufactured by Weihui Weixin Machinery Co., Ltd., the stability of the support leg structure is key to preventing tower tilting. After installation, all connecting bolts must be initially tightened.

 

Tower Assembly and Sealing

1. Layer-by-Layer Installation of Tower Wall Panels: Connect the galvanized sheet wall panels one by one with high-strength bolts, working from bottom to top. It is recommended that at least 3-4 people work together during installation: two people support the bottom and align the holes, while one person tightens the bolts at the top using an electric wrench. The bolt tightening sequence should follow a diagonal principle; that is, do not tighten them clockwise or counterclockwise sequentially, but rather diagonally, like tightening car tire bolts, to ensure even stress distribution. Special Note: The installation instructions for feed towers produced by Ningjin Zezhiyao Livestock Machinery Factory may emphasize that the special sealing strip at each panel connection must be installed properly; this is crucial for moisture and leakage prevention.

2. Top Cover and Ladder Installation: After the tower body is assembled, install the top cover. The top cover is usually designed with ventilation holes; during installation, ensure that the ventilation cap moves freely and that the bird netting is intact. Then install the ladder. Each step of the ladder should be of uniform distance and securely connected to the tower body to provide a safe passage for future inspection and maintenance.

 

Auxiliary System Installation and Connection

1. Feed Line Connection: The value of the feed turret lies in its integration with the automatic feed line system. The discharge port at the bottom of the turret needs to be precisely connected to the feed line (such as an auger or disc feeder) leading to the pigsty. Dedicated flanges and sealing gaskets must be used at the interface to ensure a tight seal and prevent feed waste and moisture absorption.

2. Level Sensor Installation: Modern galvanized feed turrets are typically equipped with electronic level sensors for real-time monitoring of the remaining feed level inside the turret. The sensor should be installed in the designated location according to the manufacturer's instructions. Wiring must be waterproofed, and the signal wire must be correctly connected to the control cabinet.

 

Post-Installation Commissioning and Acceptance

1. No-load and Load Tests: After installation, first conduct a no-load check: observe whether the tower body shakes significantly, and check whether all bolt connections are tight. Then, add a small amount of feed (e.g., 1-2 tons) for a load test, and again check the foundation, supports, and tower body for any abnormal settlement or deformation.

2. System Integration Trial Operation: Start the automatic feeding system and observe whether the feed can be smoothly delivered from the feed tower to each feeding trough in the shed. Adjust the feed rate of the feeder to ensure it meets the requirements of the livestock.